molding profile and a board material assigned to it

First you need to create an molding alias that is going to be assigned to the CLOSETROD PART

Image Removed

Create a profile for the new Closet Rod molding material

Image Removed

Then we need to create a Closet Rod Part who will have the previously created material assigned to it in all molding material schedules

Image Removed

Now we need to assign the material to the part in the material schedule

Image Removed

to assign the material in multiple schedule just Right clic on it and press change material in multiple schedule

Image Removed

Next create a board material that is going to be used when adding the molding not a molding material because to get footage not length the material need to be a board material.

We will use the 1inche tube for this example

Image Added

To add the closet Rod to a cabinet you need to create a new molding at the cabinet level by selecting a Profile

then select the Closet Rod Length 1 inche tube material previously created.

By selecting a molding material you will see that the molding profile is greyed out so you dont have to select a profile.

Image Removed

Image Added

In Cienapps you will need to create a Closet Rod Product that will have in the manufacturer tab the same dimension of you supplier Product.

take a note that the height of the product is the length in reality.

Then in your supplier Product configuration

you will have 1 for minimum qty.

the product multiplicator is going to be the heigth of your product divide by 12 because cienapps in this case will import feet from CV not full length.

And the price will be the price for the full length of the Closet Rod Molding.